检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牛建忠[1]
机构地区:[1]山西晋煤集团赵庄二号井
出 处:《煤矿现代化》2015年第1期32-34,共3页Coal Mine Modernization
摘 要:为了掌握晋煤集团赵庄二号井厚煤层综放工作面顶煤运移规律,以首个综采工作面1304工作面为工程背景,运用深基点位移法进行现场实测。结果表明:顶煤始动点随煤层位的不同而变化,顶煤层位越高始动点位置越超前,顶煤运移始动点发生在煤壁前方15-20m位置;顶煤从始动点至煤壁位移量远大于煤壁至顶煤冒落的距离;工作面顶煤运移煤壁前以水平运移为主,工作面煤壁后方以垂直运移为主。研究结果为确定合理的放煤工艺参数,提高顶煤回收率提供参考。In order to grasp the Shanxi Coal zhaozhuang II wells Thick Coal Seam Top Coal shift law, the first fully mechanized coal face to face in 1304 as engineering background, deep-site basis points measured using the displacement method. The results show that:the beginning of the top coal seam bit fixed point with different changes, the higher the top seam bit more ahead of the initiating point, the top coal initiating point shift occurred in the coal wall in front of 15~20m position;top coal from initiating point to the coal wall displacement is much larger than the amount of coal wall to top coal caving distance;former top coal face in the wall to move the horizontal transport of coal-based, face the wall behind the vertical transport of coal-based. The results for the determination of reasonable caving process parameters, increase the top coal recovery rate reference.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.229