检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Xie Xianqi Jia Yongsheng Yao Yingkang Sun Jinshan Wu Xinxia Liu Changbang
机构地区:[1]Wuhan Municipal Construction Group Co. Ltd., Wuhan 430023, China [2]Wuhan Blasting Engineering Co. Ltd., Wuhan 430023, China [3]The Changjiang River Scientific Research Institute, Wuhan 430014, China
出 处:《Engineering Sciences》2014年第6期71-79,共9页中国工程科学(英文版)
摘 要:The key technologies of precision blasting were put forward based on the characteristics of urban via- duct blasting demolition in complicated surroundings. Initial bending instability mechanics model of reinforcing steel bar frame of blasting fragmented pier and sequenced collapsed dynamic model were established for quanti- tative blasting design. Technologies of water pressure blasting were applied in multi-cell box girder fragmenta- tion. The detonating network of non-electric duplication crossover was adopted for the safety and reliability of ultra-long delay. The rationality of blasting scheme and parameters were validated by physical model test. Harm- ful effects were forecasted and controlled by integrated protective technologies. Specialization, cooperation, pre- cision, execution (SCPE) project management method was put forward for precision management. The key tech- nologies of precision demolition blasting can provide reference for similar proiects.
关 键 词:VIADUCT blasting demolition precision blasting instability model detonating network harmfuleffects control
分 类 号:TU746.5[建筑科学—建筑技术科学] TV542[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.195