检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]江苏省电力公司常州供电公司,江苏常州213003 [2]东南大学电气工程学院,江苏南京210096
出 处:《电工电气》2015年第2期47-50,共4页Electrotechnics Electric
摘 要:提出一种变电站全站测试方法,该法基于变电站综合自动化系统,结合主接线特点,在变电站进线和低压母线处布置激励点,在配电室和继电室的测控装置和电能采集装置处采集二次电流电压信号从而判别二次回路的接线情况。介绍了测试流程及关键技术,试验结果表明,该法提高了变电站电流电压互感器二次回路的检测效率和准确性。This paper presented a kind of whole substation testing method. This method was based on the integrated automation system of substation, combined with the characteristics of the main wiring. The excitation point was placed in the entry lines and low-voltage bus bar of substation, and the current and voltage signals at secondary side were collected in terminals of control device and electric energy acquisition device in distribution room and relay room to judge the wiring connection situation of secondary circuit. Introduction was made to the test flow and the key technology. The field test results indicate that this method has enhanced the efficiency and accuracy of the current and voltage transformer secondary circuit of the substation.
分 类 号:TM63[电气工程—电力系统及自动化] TM930.12
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117