作 者:崔永红[1]
机构地区:[1]山西晋城煤业集团勘察设计院有限公司,山西晋城048006
出 处:《煤炭工程》2015年第2期41-43,46,共4页Coal Engineering
摘 要:针对立井井筒过含水老空巷引起的围岩冒落空洞和突水问题,结合润东煤矿回风立井现场施工情况,提出了"联合支护+注浆充填"综合支护及堵水技术,现场应用结果表明:应用注浆充填堵水技术后,井筒涌水量从50m3/h降到0.5m3/h以下,堵水效果明显;采用"联合支护+注浆充填"技术支护冒落带空洞后,井筒破碎段围岩承载性能和抗变形能力显著提高,井壁完整无断裂现象,支护效果显著。Aiming at the surrounding rock caving cavity and water inrush during vertical shaft sinking crossing roadway of water bearing goal, water blocking technology and comprehensive support scheme of "combined supporting + grouting" were proposed, based on the situation of air return shaft construction in Rundong Coal Mine. The effect of grouting water blocking was favorable, with mine discharge reduced from 50m^3/h to 0. 5m^3/h; and the effect of caving zone cavity support, with " combined supporting and grouting" scheme, was significant with bearing capacity and deformation resistance of mine shaft surrounding rock in broken section significantly improved.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.166