检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网本溪供电公司,辽宁本溪117000 [2]国网辽宁省电力有限公司电力科学研究院,辽宁沈阳110006
出 处:《东北电力技术》2014年第11期46-49,共4页Northeast Electric Power Technology
摘 要:红石大坝溢流堰堰型为WES实用堰,溢流坝采用消力斛消能形式。在实际运行中发现,目前的消力斛存在消能效率低,对下游河床及岸坡淘刷严重现象。通过造成破坏的原因分析与模型试验,采用底流与消力池结合的消能方式,实际运行证明,改造后的消能方式改变了原来消能效率低,对下游河床及岸坡淘刷严重的现象,取得了良好应用效果,值得在同类工程中进一步推广应用。The form of Hongshi Hydropower station overflow dam is WES practical weir one,forms of dissipation is roller bucket.There are some disadvantages in actual operation,such as roller bucket efficiency of energy dissipation is low and the downstream river bed and bank are scoured seriously. Though the cause analysis on those destruction and model test,the station combines underflow energy dissipation and stilling basin. New dissipation way changed the above-mentioned defects and it has obtained good application effect in actual operation,this new way is worth further popularization and application in similar projects.
分 类 号:TM622[电气工程—电力系统及自动化] TV653[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.120