检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吉林省电力勘测设计院,吉林长春130022 [2]内蒙古东部电力有限公司经济技术研究院,内蒙古呼和浩特010080 [3]华能通辽风力发电有限公司,内蒙古通辽028000
出 处:《东北电力技术》2014年第11期57-59,62,共4页Northeast Electric Power Technology
摘 要:针对大型风电场建设规模及接入系统运行特点,运用全寿命周期理念对风电场汇集升压站多种220 kV主接线方式全寿命周期成本进行分析比较,最终推荐采用扩大单元线路变压器组接线方式,接线简化、实用性强,工程造价低、技术性好。该种接线现已在工程中采用,效果良好,可供大型风电场设计、运维参考。In view of large-scale wind farm construction and access systems operating characteristics,analysis is made on different life cycle cost of 220 kV main electrical wiring of wind farm in pooling booster station based on life cycle concept. The expanding cell line transformer unit wiring is finally chosen as the main electrical connection scheme,with characteristics of simple in structure,high reliability,lower cost and better in technology. That has be used in existing projects and has good effect,providing references for the future large wind farm design and maintenance.
关 键 词:大型风电场 汇集升压站 220 kV电气主接线 全寿命周期理念
分 类 号:TM614[电气工程—电力系统及自动化] TM645
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28