地铁隧道TBM施工振动对周边环境影响的数值分析  被引量:3

Numerical Analysis on Impact of Vibration on Surrounding Environment in TBM Construction of Subway Tunnel

在线阅读下载全文

作  者:高玮 杜家庆[2] 杨龙 

机构地区:[1]河南水利与环境职业学院,郑州450000 [2]上海交通大学船舶海洋与建筑工程学院,上海200240 [3]深业置地有限公司,广东深圳518000

出  处:《路基工程》2015年第1期100-103,共4页Subgrade Engineering

摘  要:以重庆轨道交通六号线一期工程为背景,采用数值模拟方法,分析TBM施工引起的围岩振动效应特征。模拟结果表明,对一般的民用和工商业建筑,TBM施工振动强度在安全允许范围之内,但对振动敏感的结构,施工振动超出安全允许范围,需要采取减震隔振措施。Taking Chongqing Rail Transit Line 6 (Phase I )as the background, the vibration effect of surrounding rock induced by TBM construction was analyzed by means of numerical simulation. The result shows that, for the general civil, industrial and commercial buildings, the vibration strength of TBM construction is within the range permitted; however, for the structures sensitive to the vibration, the strength is out of this range, and the vibration absorption and isolation measures are required.

关 键 词:地铁隧道 TBM 围岩振动 环境影响 数值分析 

分 类 号:U455.31[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象