检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吕梁学院,山西吕梁033000 [2]山西鑫飞能源投资集团有限公司,山西吕梁033300
出 处:《山东煤炭科技》2014年第12期40-42,共3页Shandong Coal Science and Technology
摘 要:研究表明,拱顶易受拉最先破坏,巷道跨度增大时,拱顶传递到两直墙的载荷超过直墙极限承载能力,直墙将先于拱顶受压破坏;影响碹体稳定的因素有巷道的跨度、直墙厚度、料石强度和顶板对碹体载荷分布状态;柳林矿区5#煤层巷道采用砌碹支护时,跨度不宜超过直墙厚度的11.78(遇水时5.86)倍,在顶板应力不平衡时,不宜采用砌碹支护。The study showed that, the vault is susceptible to pull the ifrst failure, the span of roadway increases, the load that the vault is transferred to two straight wall also increase, when it exceed the ultimate bearing capacity of the straight wall, the straight wall will be compressed failure in the vault;inlfuence factors of the lining stability include the roadway span, straight wall thickness, strength and the roof load distribution state;Liulin Mining Area 5# coal roadway with arching support, span is not more than 11.78 times of straight wall thickness (water 5.86) , when the roof stress is imbalance, it is inappropriate to use the arching support.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28