饱和砂性土层中的深基坑施工  被引量:1

Deep Foundation Pit Construction in Saturated Sand Soil Layer

在线阅读下载全文

作  者:孔雷 苏俊 

机构地区:[1]上海公路桥梁(集团)有限公司,上海200023

出  处:《建筑施工》2015年第2期179-181,共3页Building Construction

摘  要:常州市城北污水处理厂泵房工程需要在饱和砂性土层中进行深基坑施工,且其周边存在大量既有建(构)筑物,一旦处理不当,极易发生安全事故。因此,针对饱和砂性土胶结作用不明显以及场地地下管线复杂的特点,采用人工造浆方法对土体进行改善,不仅确保了工程质量,同时又减少了对现有建筑物的影响。该方法值得借鉴。The deep foundation pit construction of sewage treatment plant pump room project need to be carried on in saturated sand soil layer in North Changzhou. The construction site is surrounded by a large number of existing buildings, and once it is dealt with improperly, safety accidents may happen easily. Therefore, in view of the inconspicuous cementation of saturated sand soil and the characteristics of its complicated underground pipeline, the method of artificial slurry is adopted to improve the soil, which not only ensure the project quality, but also reduce the impact on existing buildings. The method is worth using for reference.

关 键 词:复杂地下环境 饱和砂性土层 深基坑 人工造浆 建筑物保护 

分 类 号:TU751[建筑科学—建筑技术科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象