检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]河南省地矿建设工程〈集团〉有限公司,河南郑州450003 [2]河南省地矿局第二地质环境调查院,河南郑州450053 [3]郑州市污水净化有限公司,河南郑州450000
出 处:《探矿工程(岩土钻掘工程)》2015年第2期82-84,共3页Exploration Engineering:Rock & Soil Drilling and Tunneling
摘 要:郑州豫翠园工程灰土挤密桩处理黄土湿陷施工中,消除黄土湿陷性的效果不好,施工后个别层位仍为轻微湿陷。通过对黄土湿陷机理、灰土挤密桩处理湿陷原理以及该工程具体问题的分析,认为灰土桩成孔方法不对以及挤密冲击力不够是导致效果不好的主要原因。将挤密桩成孔调整为冲击挤密成孔工艺,回填夯实灰土的冲击锤质量由100 kg增加到200 kg以增大冲击力,场地各土层的黄土湿陷现象全部消除,处理效果良好。In a construction for handling loess collapse with lime-soil compaction pile in Zhengzhou,there was still slight collapse in some individual horizons after the treatment. By the analysis on loess collapse mechanics,principles of collapse treatment with lime-soil compaction pile and some engineering problems,it is found that the unsuitable boring method for lime-soil pile and not enough compaction impact force are the main causes. By taking impact compaction boring and increasing the weight of compact hammer for backfilling from 100 kg to 200 kg,the loess collapse are all eliminated.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117