草街航电枢纽施工期安全通航问题及措施  被引量:1

Safety navigation problems and measures during the construction stage of Caojie navigation-power junction project

在线阅读下载全文

作  者:吴四飞 吴家浩 

机构地区:[1]重庆航运建设发展有限公司,重庆401121

出  处:《中国港湾建设》2015年第2期21-23,27,共4页China Harbour Engineering

摘  要:施工期如何满足通航要求并保证通航安全,是草街航电枢纽工程实施阶段必须解决的问题。文章在分析草街航电枢纽区通航条件及施工导流方式的基础上,阐述了提高施工期通航条件和能力的应对措施。措施采用后,通航条件明显改善。How to meet the navigation requirements and to ensure the safety navigation during the construction stage of Caojie navigation-power junction lock project is the problem that must be solved. We analyzed the navigation conditions and river diversion modes of Jialing River Caojie navigation-power junction, and discussed the measures on how to enhance the navigation conditions and capacity during the construction stage. The navigation conditions are improved obviously after adopting the measures.

关 键 词:施工期 通航安全 措施 

分 类 号:U641.73[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象