检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:梁树文[1]
机构地区:[1]中铁第一勘察设计院集团有限公司,西安710043
出 处:《铁道标准设计》2015年第3期87-90,共4页Railway Standard Design
摘 要:宝兰客运专线定西段黄土隧道施工中出现的工程地质问题主要因土体高含水率引起。单纯的物探法在黄土隧道超前地质预报中效果不理想,新方法的研究对于弥补物探法的不足及达到预报目的具有十分重要的意义。分析常规物探法的局限性,通过上庄隧道超前地质预报工程实例,提出应用综合分析法开展地质预报的新思路。Some engineering geological problems in the construction of loess tunnels of Dingxi section on Baoji-Lanzhou passenger dedicated line are caused by high moisture content of soil. The pure geophysical exploration method employed in advanced geological forecast of loess tunnel is far from satisfactory. It is great significant to look for new methods to make up for the shortage of the geophysical exploration method for good forecast results. This paper analyzes the limitations of conventional geophysical exploration method with reference to the advanced geological forecast of Shangzhuang tunnel and puts forward a new and comprehensive analysis method for geological forecast.
关 键 词:黄土隧道 超前地质预报 TSP预报的局限性 综合分析法
分 类 号:U456.33[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.139.85.192