检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鹏程
机构地区:[1]中煤科工集团重庆研究院有限公司,重庆400039
出 处:《矿业安全与环保》2015年第1期37-40,共4页Mining Safety & Environmental Protection
基 金:"十二五"国家科技支撑计划项目(2012BAK04B09-03)
摘 要:分析比较了避难硐室常用制冷方式的优缺点。通过正交试验得出对于涡流管制冷功率的影响因素中,供气温度及压力为主要因素,冷流率为次要因素;蒸发器采用二次环流螺旋紫铜管结构,传热功率为156.5 W。制冰试验结果表明:在供气流量10.8 L/s、压力0.6 MPa、冷流率0.6的条件下,在30 h内可使一定量的水凝结成冰,该结论为避难硐室制冷提供了新的解决方案和思路。In this paper,analysis and comparison were made on the the advantages and disadvantages of the commonly-used refrigeration modes in the refuge chamber. By orthogonal experiment,it came to the conclusions that the main factors affecting the vortex tube refrigeration power were the air supply temperature and pressure and the secondary factor was the cold flow rate; the evaporator adopted the secondary circulation spiral red copper tube structure and its heat-transfer power was 156. 5 W. The icemaking test results showed that under the conditions of the air supply flow rate of 10. 8 L / s,the pressure of 0. 6 MPa and the cold flow rate of 0. 6,it can make a certain amount of water condense into ice within 30 h,this conclusion provided a new solution and ideal for the refrigeration in refuge chamber.
分 类 号:TD792[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171