南水北调中线邢石段取消岳村排水渡槽方案论证  

Project Demonstration about Cancelling Yuecun Aqueduct in the Section from Shijiazhuang to Xingtai of the South-to-North Water Diversion Middle Route Project

在线阅读下载全文

作  者:董晓燕[1] 王娣[1] 

机构地区:[1]河北省水利水电勘测设计研究院,天津300250

出  处:《南水北调与水利科技》2014年第B02期86-88,共3页South-to-North Water Transfers and Water Science & Technology

摘  要:南水北调中线总干渠与石家庄市防洪堤间形成一处较大封闭区域,总面积3.12km^2。在初步设计中,该区域洪水通过岳村排水渡槽和三环路南侧的公路边沟排向右岸。在该段渠道工程实施过程中,因部分康庄和岳村段由明渠变更为暗渠,增加了洪沥水下泄通道,原岳村排水渡槽的汇流面积也由原设计的2.29km^2减小至0.48km^2,原有设计功能大大减弱。为此,根据实际情况重新对该区域左岸排水分区和排水通道进行分析,在满足左岸排水安全要求的前提下,对原岳村排水渡槽的取消进行论证。A large enclosed areas is 3. 12 km^2 in total, which is formed between the South-to-North Water Diversion Middle Route Proiict and the levee in Shijiazhuang. In the preliminary design of the main channel, the regional flood discharged through Yueeun drainage aqueduct and the Third Ring road to the right bank of the ditch row. During the process of this channel project implementation, because part of the Kangzhuang drainage aqueduct and Yuecun drainage aqueduct changed from open channels to culverts,increasing the flood channel draining discharged. Confluence area of Yuecun drainage aqueduct reduce from 2. 29 km^2 to 0.48 km^2 and original design features greatly weakened. According to the ac- tual situation, this thesis reanalyzed the drainage district and drainage channels on the left bank of drainage. And argumentaed the cancel mountain village rationality under the premise to meet the requirements of the left bank of the drainage.

关 键 词:南水北调中线 邢石段 取消岳村排水渡槽 方案论证 

分 类 号:TV68[水利工程—水利水电工程] TU8[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象