检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《现代测绘》2014年第2期25-28,共4页Modern Surveying and Mapping
摘 要:随着高速铁路在我国的大规模建设,各种等级GPS铁路控制网的布设也陆续展开,用于解算GPS基线的软件,除了各种随机软件如TGO、LGO等外,GAMIT也是一款解算GPS基线的可靠工具,利用GAMIT可以有效消除长基线观测中电离层的影响[1],且可以加入潮汐改正。本文介绍了GAMIT软件在多天多时段工程控制网中的解算流程,以及相应的C-SHELL批处理程序[2],分析了不同星历对基线解算结果的影响,验证了超快速星历与快速星历同样可以获得高精度及高可靠性的解算结果。With the construction of high railway in China,GPS control network of different levels has already set up,except some supporting software such as TGO,LGO,GAMIT is also a reliable tool in processing GPS baseline.With the help of GAMIT the Ionosphere effect in long baseline can be highly decreased,also tide effect can be removed.In this paper,the procedure using GAMIT in processing GPS network of multi-day and multi-session has introduced by corresponding C-SHELL bat program,and different ephemeris affect on baseline result has analyzed,a conclusion is draw that Ultra-rapid ephemeris and quick ephemeris worked well in high-precision GPS survey.
关 键 词:高速铁路 GPS控制网 GAMIT 卫星星历 多时段
分 类 号:P228[天文地球—大地测量学与测量工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28