检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]黑龙江省寒地建筑科学研究院,哈尔滨150080 [2]哈尔滨工业大学,哈尔滨150001 [3]黑龙江省建筑职业技术学院,哈尔滨150025
出 处:《建筑科学》2015年第2期40-45,共6页Building Science
摘 要:通过对黑龙江省外墙外保温体系和自保温体系等新型建筑节能墙体施工后基墙及保温层内的相对湿度变化进行跟踪测试,总结出不同墙体内部的传湿过程、基墙及保温层干燥时间,以及墙体内湿度与环境变化的关系,为现场测试墙体热阻及建筑节能设计提供参考。The relative humidity in the insulating layer and basic wall is tested after construction. The thermal insulation wall systems in research mainly include exterior thermal insulating system and self-insulating wall system in Heilongjiang province. The conclusion is given for the moisture transfering process and the drying time for the insulating layer and wall. The humidity changing of the wall is mainly relating to the indoor environment condition. The research of humidity provides the basic data for testing the thermal resistance of the insulating wall and designing energy efficiency building.
分 类 号:TU831.1[建筑科学—供热、供燃气、通风及空调工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.44