检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]西藏大学农牧学院,西藏自治区林芝县857000
出 处:《西北水电》2015年第1期77-80,共4页Northwest Hydropower
摘 要:以西藏满拉水利枢纽为案例,从渗流分析的基本理论和计算方法着手,对西藏地区覆盖层较厚的土石坝进行渗流分析。通过渗流方程和热传递能量方程的相似性,利用Ansys的热处理模块对大坝的渗流进行数值模拟和计算,通过计算的结果和现场测压管的水头观测值进行对比和分析,结果表明,Ansys可应用于工程设计中的渗流计算,从而对土石坝后期加固处理具有指导性。With the case of Laman Project in Tibet,seepage of the earth- rock fill dam on the thicker overburden in Tibet Autonomous Region is analyzed based on the basic theory and calculation methods for the seepage analysis. Through the similarity of seepage equation and thermal transmission energy equation and by application of the Ansys thermal handling module,the seepage value simulation and calculation are carried out. Comparison and analysis of the calculation results and the measured water head by piezometer prove that Ansys can be utilized for the seepage calculation. Accordingly,it can guide the late reinforcement of the earth- rock fill dam.
分 类 号:TV223.4[水利工程—水工结构工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3