红山嘴水电站抽水融冰原型试验及不冻长度计算  被引量:1

Hongshanzui Hydropower Station Pumping Melting Ice Prototype Experiment and Nonfreezing Length Calculation

在线阅读下载全文

作  者:朱苗苗[1] 刘焕芳[1] 宗全利[1] 

机构地区:[1]石河子大学水利建筑工程学院,新疆石河子832003

出  处:《中国农村水利水电》2015年第2期129-131,共3页China Rural Water and Hydropower

基  金:国家自然科学基金项目(51269028)

摘  要:主要介绍了新疆红山嘴水电站应用抽水融冰技术解决长期困扰水电站运行的冰害问题,给出了高寒区引水渠道冬季运行抽水融冰基本原理。根据原型观测结果,分析得出了抽水后渠道水温的沿程变化规律。参照经验公式对不冻长度进行了计算,并将结果与2级引水渠上布置的融冰井间距作了对比,为抽水融冰井群优化布置等相关内容研究奠定了基础。This paper mainly introduces the application of pumping melting technology to solve the problem of ice that has plagued hydropower station operation for a long time in hongshanzui hydropower station,xinjiang.And first the basic principle of pumping water melting ice at diversion channel is proposed in dry cold plateau.According to the results of prototype observation,the rule of water's temperature varies along the channel after well water is pumped.And the non-freezing length is calculated by referring to the empirical formula.All the research provides the basis for the optimization of pumping melting wells and other related research.

关 键 词:抽水融冰 原型试验 不冻长度 

分 类 号:TK79[动力工程及工程热物理—流体机械及工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象