检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]国网山东省电力公司检修公司,济南250117
出 处:《山东电力技术》2015年第1期48-52,56,共6页Shandong Electric Power
摘 要:为提高电力运行人员的技术能力,以变电站为仿真对象,提出利用高层体系结构(High level Architecture,HLA)开发变电站培训仿真系统,介绍系统的功能实现及其特点。按照HLA的要求,详细描述建模过程、对象模型以及联邦成员的划分,设计了基于步进和事件相结合的时间推进方式,并结合具体实例,给出联邦成员的程序框架,完整地实现变电站全范围、全过程仿真,并设计增加一些新的功能,提高了系统的运行和培训效率,取得了良好的培训效果。To improve the technical ability of grid operation personnel,taking the substation as simulation object,an idea of using HLA to develop substation training simulation system is proposed.Function realization and characteristics of the system are introduced and modeling process,object model and federate are described.The time advance strategy of TAR and NER is designed and federate framework is presented.Full scope and whole process substation simulation is realized with some new functions.The training simulation system can improve operation efficiency and achieve good training effect.
关 键 词:高层体系结构 变电站 仿真 时间管理 运行支撑环境
分 类 号:TM72[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.148.197.73