气井带压作业技术装备升级换代之路——现场试验进展  被引量:9

A Path to Snubbing Technology and Equipment Upgrading for Gas Well Operations---Advances in Field Tests

在线阅读下载全文

作  者:杨令瑞 谢正凯[2] 韩烈祥 谯抗逆 马发明[3] 

机构地区:[1]中国石油集团川庆钻探工程有限公司 [2]中国石油天然气集团公司科技管理部 [3]中国石油西南油气田公司

出  处:《石油科技论坛》2015年第1期18-21,35,共5页PETROLEUM SCIENCE AND TECHNOLOGY FORUM

基  金:中国石油天然气集团公司重大现场试验项目"气井带压作业技术与装备现场试验"(项目编号:2010F-03)部分研究成果

摘  要:带压作业是近年来井下作业技术发展的新亮点,是稳定和提高单井产量的一把利剑。为了加速气井带压作业装备和技术升级,适应勘探开发发展趋势和生产需求,中国石油天然气集团公司找准着力点和突破点,组织实施了气井带压作业技术与装备现场试验。项目实施过程中不断创新,集中优势资源,实施一体化管理,确保现场试验科学安全。依托川渝页岩气大开发机遇,先后实施起下管串、带压钻磨铣等现场试验60井次及隐患井治理13井次,有效保障了致密气、页岩气等非常规油气开发效果,实现年增产14400×104m3,直接经济效益2亿元,取得显著成效,技术装备实现升级换代,作业实力大幅提升。Snubbing operation is a new bright spot of downhole operation technology newly developed in recent years. It's an edge tool to raise single-well production. To accelerate the upgrading of gas-well snubbing technology and equipment in order to accommodate E & D demands and trend, China National Petroleum Corporation focused the breakthrough point on field tests of gas-well subbing technology and equipment. To ensure the tests scientific and safe, innovations were continually made, superior resources centralized, and integrated management adopted. Just upon the opportunity of shale gas development in Sichuan-Chongqing area, 60 snubbing jobs have been tried on gas wells, including pipe stripping, hot-tapping and milling. And another 13 snubbing jobs were test-proved in well workover operations. All those jobs have guaranteed the effective development of unconventional tight-gas or shale-gas resources. Remarkable results have been achieved. The annual production is increased by 14400x 104m3, a direct economical benefit of 200 million RMB created, the snubbing technology & equipment upgraded, and the snubbing operation largely improved.

关 键 词:气井 带压作业 技术装备 现场试验 

分 类 号:TE35[石油与天然气工程—油气田开发工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象