检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:陈豪[1,2] 张鹏[2] 邱小弟[2] 李志祥[3] 曹学兴[2] 毛玉平[3]
机构地区:[1]河海大学水利水电学院,江苏南京210098 [2]华能澜沧江水电有限公司,云南昆明650214 [3]云南省地震局,云南昆明650041
出 处:《水电能源科学》2015年第2期135-139,148,共6页Water Resources and Power
基 金:国家科技支撑计划课题(2013BAB06B04)
摘 要:以我国西南地区高坝大库型水电开发的典型代表小湾水电站为例,从水库诱发地震监测与预警系统建设的必要性入手,分析了小湾水库地质环境与水库诱发地震形成机理,详细介绍了小湾水库诱发地震监测与预警系统的系统架构、站点布设、运行情况,为西南地区水库诱发地震监测系统的建设提供了借鉴和参考。Taking Xiaowan hydropower station for an example,which is the typical representative of high dam and large reservoir in the hydropower development of China,the geological environment of Xiaowan reservoir and the formation mechanism of reservoir induced earthquake were analyzed with the beginning of the necessity of construction reservoir induced earthquake monitoring and forecasting system.The framework,site layout and operation of the reservoir induced earthquake monitoring and forecasting system were presented in detail.Therefore,it provides a reference for construction of reservoir induced earthquake monitoring system in southwest region of China.
关 键 词:小湾水电站 水库诱发地震 地震监测 水库诱发地震监测与预警系统
分 类 号:TV697.24[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38