检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]北京大学深圳研究生院环境与能源学院城市人居环境科学与技术重点实验室,广东深圳518055
出 处:《水处理技术》2015年第3期112-116,共5页Technology of Water Treatment
基 金:深圳市科技计划项目(CXB201105100085A)
摘 要:研究了雌酮(E1)、17β-雌二醇(E2)和17α-乙炔基雌二醇(EE2)在Carrousel 2000型氧化沟中试工艺中的去除率及其主要影响因素。考察的运行参数包括污泥停留时间(SRT)、水力停留时间(HRT)和曝气量。结果表明,该中试工艺对雌激素去除效果较好,雌激素的去除与SRT、HRT和曝气量均呈正相关关系,而与TN去除率呈一定负相关关系。综合考虑常规水质指标的去除率,实验中去除雌激素的最优条件为25 d的SRT、20 h的HRT和2.2 m3/h的曝气体积流量,此时E1、E2和EE2的去除率分别为93.4%、94.7%和78.8%。The removal rates of oestrone (E1), β-estradiol (E2) and 17α-ethinyl estradiol (EE2) and their main factors were investigated in the Carrousel 2000 pilot scale oxidation ditch process. The effects of different operation conditions on the removal of estrogens were discussed, including solid retention time (SRT), hydraulic retention time (HRT) and aeration conditions. Results showed that higher SRT, HRT and aeration conditions could facilitate the removal of estrogens in oxidation ditch process. A negative correlation was observed between the removals of estrogens and that of total nitrogen. The optimized operation condition for the studied oxidation ditch bioreactor were 25 d for SRT, 20 h for HRT and aeration condition being 2.2 m3/h, where the removal rates of El, E2 and EE2 were 93.4%, 94.7% and 78.8%, respectively.
关 键 词:氧化沟中试工艺 雌激素 污泥停留时间 水力停留时间 曝气量
分 类 号:X703.1[环境科学与工程—环境工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.198