检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交第四航务工程勘察设计院有限公司,广东广州510230
出 处:《水运工程》2015年第2期66-70,共5页Port & Waterway Engineering
摘 要:为降低港珠澳大桥珠澳口岸人工岛工可总平面布置的阻水率,巧妙利用澳门明珠陆域向东突出的地形地貌,调整珠海接线人工岛布置,使珠澳口岸人工岛的阻水横断面减少了37%,同时使珠海接线人工岛的费用减少、工期缩短、施工难度降低。港珠澳大桥珠澳口岸人工岛填海工程总平面因地制宜的优化设计思路及方法获得了初步设计专家评审会的肯定,可为类似河口区临近大陆人工岛平面布置提供有益的参考。To reduce the water block rate of the Zhuhai-Macao frontier port artificial island designed in the feasibility study phase,we ingeniously make use of Macao-Mingzhu area's geomorphologic feature of projecting outward to the east to adjust the layout of Zhuhai connecting route island,and obtain a good result that the water block rate of the Zhuhai-Macao frontier port artificial island decreases by 37 percent.Meanwhile,the cost,construction period and construction difficulty are reduced.The optimal design thoughts and methods in line with local conditions using for the general layout of Hongkong-Zhuhai-Macao bridge Zhuhai-Macao frontier port artificial island reclamation work gain the affirmation of examination and appraisal experts for the preliminary design,and thus may serve as a reference for the general layout of similar artificial island projects on river estuarine zone and nearby the main land.
分 类 号:U655.544[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.94