检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖北省电力公司,武汉市430000 [2]武汉大学电气工程学院,武汉市430072
出 处:《电力建设》2015年第3期59-64,共6页Electric Power Construction
摘 要:2017年蒙西至湖北±800 k V特高压直流输电通道建成,将与湖北电网现有交流特高压输电通道一起,形成特高压交直流并联的格局,对湖北电网的结构形态、运行特性变化产生重要影响。以2017年湖北电网丰大运行方式为背景,根据湖北电网规划电力流,利用仿真软件PSASP建立湖北电网网架结构模型。采用连续潮流算法计算求取湖北电网对蒙西特高压直流的消纳极限,并对消纳极限运行方式下的湖北电网进行稳定校核,包括静态安全分析、单一故障及严重故障的暂态稳定校核。±800 kV Mengxi-Hubei UHVDC transmission lines will be built in 2017, which will have formed a UHADC parallel power system with the existing UHVAC transmission lines in Hubei province. It will have a great influence on the structure and operation characteristics of Hubei power grid. Based on the operation during high flow periods and planning capacity of power delivering of Hubei power grid in 2017, the network structure model was set up with using PSASP software. The continuation power flow (CPF) algorithm was used to calculate the power transfer limit of Mengxi-Hubei UHVDC transmission lines. The stability of Hubei power grid was verified with the Mengxi-Hubei UHVDC transmitting limit power, which included static security analysis, transient stability check of single and serious fault.
分 类 号:TM74[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222