屯兰矿地面瓦斯抽放钻孔施工工艺研究  被引量:5

Research on Borehole Construction Process of Ground Gas Drainage in Tunlan Coal Mine

在线阅读下载全文

作  者:岂春明 

机构地区:[1]西山煤电集团有限责任公司,山西太原030053

出  处:《煤炭工程》2015年第3期53-54,57,共3页Coal Engineering

摘  要:根据屯兰矿3号地面瓦斯抽放钻孔的特点,对屯兰矿3号抽放钻孔施工工艺进行了设计,并从开钻前准备、开钻、下套管及固管四方面对钻孔施工进行了论述,结果表明,施工的Φ914mm、孔深360m的瓦斯管道井最大孔斜40°,终孔最大偏斜0.89m,套管顺利下入,固管质量良好,满足施工要求,安全和经济效益明显。According to characteristics of the No. 3 ground gas drainage boreholes of Tunlan Coal Mine,the construction process of drainage borehole was designed,including drilling preparation,drilling,casing and pipe fixing. The maximum hole inclination of the Φ914mm,360 m gas piping shaft was 40',final hole maximum deviation was 0. 89 m,the casing was smooth,pipe fixing quality was favorable,the construction safety requirements was satisfied and obvious economic benefit was achieved.

关 键 词:大孔径 地面瓦斯抽放钻孔 扩孔 一次成孔 钻孔施工工艺 

分 类 号:TD712.6[矿业工程—矿井通风与安全]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象