检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]长安大学公路学院,西安710054
出 处:《四川理工学院学报(自然科学版)》2015年第1期59-62,共4页Journal of Sichuan University of Science & Engineering(Natural Science Edition)
摘 要:以某建筑深基坑工程为例,对基坑开挖各阶段上部土钉墙土钉轴力进行实测,分析并研究了基坑开挖及支护过程对土钉轴力的影响,具体考虑了基坑开挖时间与土钉轴力、土钉轴力变化速率以及同一土钉不同节点位置处轴力变化趋势之间的关系。对今后类似的基坑工程中的上部土钉墙的设计和分析提供借鉴和参考。With a deep foundation pit engineering an example,for each stage of excavation,the soil nail axial force of upper soil nail wall is monitored. The effect of the process of foundation pit excavation and support on soil nails axial force is analysed and studied,specially,the relationship between excavation time and axis-force of soil nailing,changing rate of axisforce,as well as changing trend of axial force in different positions with the same soil nail,is considered. It can provide a reference for the design and analysis of top soil-nailed wall in those similar foundation pit engineerings.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28