检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:田雪竹[1]
机构地区:[1]新疆额尔齐斯河流域开发工程建设管理局,新疆乌鲁木齐830000
出 处:《东北水利水电》2015年第3期26-27,50,共3页Water Resources & Hydropower of Northeast China
摘 要:新疆北部某水利工程是我国在严寒地区修建的第一座百米级全断面碾压混凝土重力坝,冷、热、风、干气候特征突出,本文从大体积混凝土温度标准与温控措施两方面进行研究及实践,使混凝土结构体产生裂缝的几率将大大降低,尤其可以大幅度减少深层贯穿性裂缝产生的几率,提高混凝土结构体的安全度。Some a hydro project of North Xinjiang, the first hectometer grade full section roller compacted concrete gravity dam, is built in severe cold area in China, which has the prominent climatic characteristics of cold, hot, wind and arid. Through research and practice of temperature standards and temperature control measures for the mass concrete, the occurrence frequency of the crack in concrete structural body is greatly decreased,es p ecially for the deep penetrating cracks. Therefore, the security of the concrete structural body would be improved.
分 类 号:TV521[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.137.213.117