检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]兰州资源环境职业技术学院,甘肃兰州730021 [2]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065
出 处:《东北水利水电》2015年第3期68-70,72,共3页Water Resources & Hydropower of Northeast China
摘 要:德尔西水电站位于南美洲,属于多沙河流。本文采用CRS-1河流泥沙数学模型对水库进行泥沙淤积计算。根据库区纵横断面、水沙代表系列和泥沙级配等条件,对3种运行方式进行了计算。根据计算结果,电站淤积平衡年限约为2年,并给出了推荐电站运行方式。水库按推荐运行方式运行,淤积平衡后,库区泥沙淤积量15.27万m3,正常蓄水位以下库容损失25.18%,调节库容损失率8.85%,余27.38万m3调节库容供发电等使用。The Delsi hydropower station is located in South America. The river sediment mathematical model of CRS-1 is adopted to calculate the reservoir sediment deposition. Based on the conditions of the reservoir vertical and cross section, the representative series data of water and sediment, the sediment gradation, etc, the sediment deposition are calculated under three operational modes. The results show that the sedimentation balance period is two years. After the sedimentation balance with recommended operational mode of reservoir, the sediment accumulation is 152,700m3 in the reservoir region, the reservoir capacity lost under normal water level is 25.18%, the loss rate of regulated storage capacity is 8.85%, and then the regulated storage capacity is reach 273,800m3 for the power generation.
关 键 词:德尔西 CRS-1河流泥沙数学模型 泥沙淤积 库容损失
分 类 号:TV697.22[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.218.161.96