多线程并行的水利工程施工洪水频率计算  

Multithread Parallel Computation of Flood Frequency in Construction Period of Water Conservatory Project

在线阅读下载全文

作  者:闵瑞[1] 刘全[1] 

机构地区:[1]武汉大学水资源与水电工程科学国家重点实验室,湖北武汉430072

出  处:《水电与新能源》2015年第3期39-42,共4页Hydropower and New Energy

基  金:国家自然科学基金项目资助(项目编号:51379164)

摘  要:运用抽样统计方法计算施工洪水频率时,随机抽样统计计算量巨大,在多核微机上利用多线程并行计算能提高运算效率。在分析施工洪水抽样统计模型和多线程计算可行性的基础上,采用Delphi编制多线程的洪水频率分析计算软件。单线程和多线程计算效能分析比较说明:利用多线程计算在计算量较大的情况下,具有明显的时间优势。In the flood frequency computation with the statistical sampling method, the computation work of random sampling statistics is dramatic. While the multithread parallel computation on multi-core microcomputer shows much higher efficiency. Thus, with an analysis on the statistical sampling model of flood frequency in construction period and the fea- sibility of multithread computation, a muhithread flood frequency analysis code is developed with Delphi. Efficiency comparison shows that the muhithread computation method is much superior when large amount of calculation is needed.

关 键 词:多线程 施工洪水 频率分析 

分 类 号:P333.9[天文地球—水文科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象