机构地区:[1]湖北省漳河工程管理局,湖北荆门448156 [2]湖北路达胜工程技术咨询有限公司,湖北武汉430070
出 处:《水电与新能源》2015年第3期57-60,共4页Hydropower and New Energy
摘 要:依据南水北调中线一期引江济汉工程建设具有周期长、投资大、参建单位多、信息量广泛、对信息收集与处理要求比较高、且管理较为复杂的特点,采用分类、编码、强化管理,提升自动化管理水平等方法对实时信息进行管理,确保了信息收集整理的及时性、准确性、规范性和实用性。实践证明,效果较好。In the water diversion works from the Yangtze River to the Hanjiang River of the middle route project in the south-to-north water diversion project, the information management is rather difficult due to the long duration, massive investment, large number of contractors, large amount of information, and the high standard of information acquisition and processing. Thus, successful information management experiences are summarized including the classification, coding, and automatic management of the real-time information, which guarantee the timeliness, accuracy, standardization and practicality of information acquisition and processing.
分 类 号:TV67[水利工程—水利水电工程] TU712.2[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33