检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《电力需求侧管理》2015年第2期46-48,共3页Power Demand Side Management
摘 要:最大需量的计算是否准确,对于采用最大需量计算基本电费的企业用户来说至关重要。影响最大需量准确性的因素包括最大需量设置周期、抄表例日的调整、最大需量记录装置是否准确等。通过对最大需量计算中产生问题的具体分析、探讨,明确了影响最大需量计算准确性的几种因素,并从管理和技术方面提出相关建议,以期对准确计算最大需量用户的电费提供借鉴。The calculation of basic electricity for the maximum demand of enterprise customers is critical. Many factors influence the accuracy of maximum demand, including demand maximum setting cycle, adjusting meter reading date, whether recorded device is accurate. In this paper, through the discussion analysis,specifically on the maximum required in the computation of the question as the breakthrough point, it finds out several factors affecting demand maximum accuracy and puts forward some suggestions from the aspects of management and technology. To accurately calculate the maximum demand of user of electricity has important significance.
分 类 号:TM933.4[电气工程—电力电子与电力传动] F407.61[经济管理—产业经济]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249