某引水工程施工控制网测量过程中的几点做法  

Some Methods in the Process of Construction Control Network Survey of a Water Diversion Project

在线阅读下载全文

作  者:李丽华[1] 

机构地区:[1]山西省水利水电勘测设计研究院,山西太原030024

出  处:《山西水利科技》2015年第1期46-48,共3页Shanxi Hydrotechnics

摘  要:一项引水工程是某水库工程先期实施的重要水利工程项目,在施工控制网测量过程中,传统作业不能满足设计周期和技术精度的要求,文中阐述了该工程测绘中使用了高精度的全球定位系统(GPS)接收机、精密电子水准仪等先进的仪器设备,使用计算机程序计算和平差,从具体工作的实用、高效出发,提高了工作效率和成果精度,节约了人力、物力和财力,创造了良好的社会效益和可观的经济效益。Water diversion project is an important project to early implementation of reservoir engineering. In the process of construction control network survey, traditional operation cannot meet the requirement of the design cycle and technical precision. In engineering survey of this project, advanced instruments such as high-precision global position system(GPS)receivers and high-precision electronic levels were used. Computer programs were adopted for calculation and adjustment. Starting from the practical and efficient of specific work, the working efficiency and precision of achievement were improved; the manpower, material and financial resources were saved, so that a good social benefit and considerable economic benefits were created.

关 键 词:某引水工程 施工控制网 测量 

分 类 号:TV221[水利工程—水工结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象