淮河干流蚌埠—浮山段行洪区调整和建设工程代建制的实践与探讨  

Practice and Discussion on Huaihe River Main Stream Bengbu—Fushan Segment Flood Flowing Zone Adjustment and Construction Project Agent Construction System

在线阅读下载全文

作  者:李玉强[1] 刘建树[1] 郑宝[1] 

机构地区:[1]淮河水利委员会治淮工程建设管理局,安徽蚌埠233011

出  处:《水利建设与管理》2015年第3期41-44,共4页Water Conservancy Construction and Management

摘  要:淮河干流蚌埠—浮山段行洪区调整和建设工程是淮河进一步治理38项工程中第一个实行代建制的项目。本文围绕项目建设管理以及监督过程中出现的新情况、新变化展开探讨,探索做好工程代建制管理的有效措施,在保证工程顺利实施的同时,为治淮工程建设代建制积累模式经验。Huaihe River main stream Bengbu—Fushan segment flood flowing zone adjustment and construction project is the first project implementing agent construction system among 38 projects in further controlling Huaihe River. In the paper,project construction management,new situation and new change in supervision process are discussed for exploring effective measures in project agent construction system management,thereby accumulating experience for Huaihe River control project construction agent construction system mode when smooth implementation of the project is ensured.

关 键 词:淮河干流 建设工程 代建制 

分 类 号:TV512[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象