P项目大型框架、壁板类结构件焊接变形控制方案研究  被引量:3

Study on Control Measures for Large-scale Frame and Panel Structure about P Program

在线阅读下载全文

作  者:冯义[1] 石美道 蒋能东[1] 洪阳东 

机构地区:[1]东方汽轮机有限公司,四川德阳618000

出  处:《东方汽轮机》2015年第1期35-41,共7页Dongfang Turbine

摘  要:P006/007风洞项目与常规汽轮机结构差异大,焊缝无损检验和尺寸精度要求都较高,其装焊部套中的框架类、壁板类等结构主体都为焊接工字钢、焊接槽钢,整体尺寸长、刚性差。文章从零件下料、坡口设计及焊接过程控制等方面进行深入探讨和分析,对风洞项目装焊件的焊接变形控制措施进行了阐述。The P006/007 wind tunnel program is different from the conventional turbine structure, it requires high standards about weld non-destructive testing and size precision testing, and claims a structure body of frame or panel of welding die consisting of welded I-beam and welded channel iron which have long size and weak rigidity. Basing on deep discussion and analysis of parts cutting, groove design and welding process, the article descripts some control measures on welding deformation of weldment of wind tunnel program.

关 键 词:风洞项目 结构主体 焊接变形 

分 类 号:TH16[机械工程—机械制造及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象