检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中煤科工集团唐山研究院有限公司,河北唐山063000
出 处:《金属矿山》2015年第4期18-20,共3页Metal Mine
摘 要:王村煤矿按设计的侯西铁路保护煤柱开采后地表出现了大量裂缝,导致侯西铁路局部路段的路基产生下沉开裂,影响了路基的稳定及列车的安全运行。为确保王村井田内侯西铁路保护煤柱设计的科学、合理,对地表产生裂缝的原因进行了分析,主要由于该区域采深小、基岩薄、第四系黄土层塑性小等特殊地质条件,以及13506工作面开采后区段煤柱垮落,达到充分采动,从而导致地表移动变形加剧,地表裂缝比较发育。并根据分析结果对铁路保护煤柱进行了重新划定。A large number of cracks appear after the coal resources are mined out according to the design of protective coal pillar under Houxi railway in Wangcun coal mine,leading to subsidence and crack in local sections of Houxi railway roadbed. This affects the stability of roadbed and the stable operation of the train. In order to make sure the design of protective coal pillar under railway more scientific and reasonable,the reasons for cracks are analyzed. Due to the special geological conditions,including the small depth,thin bedrock,less plastic of Quaternary loess layer,and the failure of coal pillars resulted from the mining of 13506 working face to reach full-scale mining,the surface movement and deformation increased,and surface cracks are well developed. According to the analysis,the proactive coal pillar will be re-planned.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15