摘 要:针对冬瓜山铜矿厚大矿体盘区隔离矿柱开采过程中的地压危害问题,应用数值模拟方法并采取微震监测等手段进行分析研究。结果表明:开采过程中发生岩爆的可能性很低;由于隔离矿柱开采的技术条件劣化很多,位移和塑性区域明显增大,应该对单个开挖单元的空间体量加以控制。对模拟的54#隔离矿柱而言,开挖空间高度不宜超过50 m,长度不宜超过48 m,采用间隔开挖顺序能够降低工程岩体的应力集中度,对工程稳定有利。The underground pressure hazard in the mining of thick and large ore-body by using panel insulating pillar at Dongguashan copper was analyzed by numerical simulation and microseismic monitoring. Results reveal that rock burst in the mining process is unlikely to occur with very low probability. The volume of each excavation unit should be controlled because displacement and plastic zone increase obviously due to degraded technical condition of mining using insulating pillar. As regards the simulated insulating pillar 54#,the height of excavation space should not exceed 50 m,and the length should not be more than 48 m. Moreover,interval mining sequence could reduce the stress concentration of engineering rock mass,and is conducive to engineering stability.
分 类 号:TD85[矿业工程—金属矿开采]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28