检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
出 处:《水电站机电技术》2015年第4期5-8,71,共4页Mechanical & Electrical Technique of Hydropower Station
摘 要:根据铜街子水电站12号水轮机组增容改造要求,在仅更换转轮的情况下,水轮机出力由154 MW增容到178.57 MW。本文详细介绍了在水轮机转轮水力开发过程中的参数选择,以及在转轮设计过程中针对铜街子电站水轮机具体水力参数所采取的方法和措施,对部分水轮机全流道数值计算结果和模型试验结果进行了简单分析。电站实际运行情况表明,铜街子电站水轮机的综合水力性能得到较大幅度的提升。According to the requirement of capacity expansion renovation at Tongjiezi hydropower station No.1 2 unit, the turbine power increases from 154 MW to 178.57 MW only by replacing a new runner. The detailed parameter selection and optimal method for the turbine runner at Tongjiezi hydropower station No.12 unit are introduced in the present paper. The numerical simulations and test results are analyzed for the turbine, and the running state shows that the comprehensive hydraulic performance of the turbine is greatly improved.
关 键 词:轴流式水轮机 水轮机增容改造 转轮 数值计算分析 模型试验
分 类 号:TV734.1[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.28