检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]吉林省吉能电力有限公司两江分公司,吉林安图133600 [2]中水东北勘测设计研究有限责任公司,吉林长春130021
出 处:《东北水利水电》2015年第4期38-40,共3页Water Resources & Hydropower of Northeast China
摘 要:二道松花江先后在2010年和2013年发生了特大洪水。对两江水电站延长洪水系列后设计洪水成果有较大增加,由此带来了水库防洪能力不足问题。文章介绍了两江水电站汛期洪水分期的可行性和汛期分期时段的划分;通过汛期分期调洪成果的分析,阐述了两江水电站分期洪水调度方案可行性和合理性。Thecatastrophic flood has occurred in 2010 and 2013 in the Erdao Songhuajiangriver. The results of the design flood have the greater increase after the flood series is extended for the Liangjianghydropower station,which produces the shortageproblem of the flood control capacity of the reservoir.The paper introduces the feasibility of flood divided into stages and the division of stage period in flood season for Liangjianghydropower station. The paper elaborates the feasibility and rationality of scheduling schemeof the stage flood for the hydropower station by analyzing the stage flood results in flood season.
分 类 号:TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15