检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]中交四航工程研究院有限公司,广东广州510230
出 处:《水运工程》2015年第3期47-50,56,共5页Port & Waterway Engineering
摘 要:地表沉降量作为判定地基卸载时间的直接技术指标,其计算的准确性已成为各类工程技术人员面临的难题之一。为研究某软基施工过程中加固效果的动态变化情况,采用Hermite插值法将现场地表沉降实测数据转化为等时间间隔,并基于转化结果建立了GM(1,1)模型和对应的时间响应函数,以预测不同时间下的地表沉降量。分析计算结果表明:GM(1,1)模型的计算精度等级为1级,对不同时间下的地表沉降量能进行较好的预测;同时,为今后解决类似复杂沉降预测问题提供了借鉴和指导。The surface subsidence is a direct index indicating in unloading time, and the calculation accuracy has become one of the difficulties faced by all kinds of engineers. To study the dynamic change of reinforcement effect with a soft foundation construction process, the measured data of surface subsidence has been converted to the same interval by hermite interpolation in this paper. Base on the conversion results, GM ( 1, 1 ) model and the corresponding function with time has been established to predict the surface settlement in different time. The results of analysis showed that the calculation accuracy by the GM( 1, 1) prediction model is the first level, which could well predict the surface subsidence in different time, meanwhile, it would provide reference and guidance for solving the related complex settlement prediction problems in the future.
关 键 词:Hermite插值法 GM(1 1)模型 非等时间间隔 沉降量
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222