超高层桁架转换层钢结构施工技术  被引量:12

CONSTRUCTION TECHNOLOGY OF SUPER HIGH-RISE STEEL STRUCTURE TRUSS TRANSFER STOREY

在线阅读下载全文

作  者:张良[1] 张莉莉[1] 张玉品 付继新 吴华[1] 

机构地区:[1]北京六建集团有限责任公司,北京100143

出  处:《建筑技术》2015年第4期334-337,共4页Architecture Technology

摘  要:北京绿地中心4号商务办公楼工程建筑高度达260 m,在42,43层设有桁架转换层。通过应用Takla软件与BIM技术相结合的方式进行桁架层钢构件的深化设计,并在工厂进行了桁架层的预拼装。桁架层超重构件创新采用滑移钢平台措施进行吊装,对钢筋连接采取了优化措施,解决了桁架转换层结构复杂、施工困难的问题,确保了桁架层的整体施工进度与质量。Beijing Greenland Center No.4 office building construction reaching a height of 260 m, with truss transfer layer In 42 and 43 layer, the application of Takla and BIM a combination of technologies for deepening the design truss of steel member, and in processing plants was truss-pre assembled.The truss layer overweight component using slip steel platform innovation measures for lifting. Optimized measures against rebar connecting. Solve truss transfer storey structure was complex and difficult problems of construction, ensures the overall construction schedule and quality of trusses.

关 键 词:桁架转换层 深化设计 预拼装 滑移钢平台 优化措施 

分 类 号:TU17[建筑科学—建筑理论]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象