小铁山矿胶结充填采矿法底柱上充填体设计及研究  

Design and Study on Filling Mass over the Sill Pillar in Cemented Stopping-Filling Mining in Xiaotieshan Mine

在线阅读下载全文

作  者:王永智[1] 寇明遥 

机构地区:[1]西北矿冶研究院,甘肃白银730900

出  处:《甘肃冶金》2015年第2期1-3,7,共4页Gansu Metallurgy

摘  要:对小铁山矿上向巷道式胶结充填采矿法在充填体下底柱回采工艺进行系统的分析和研究。运用充填体的弹性力学理论,结合现场生产的现状,在安全的条件下,合理进行上向巷道式第一分层充填体的设计,解决困扰矿山充填体下底柱回采问题。the paper has conducted analysis and study on sill pillared stopping technology under the filling mass adopting the upwards laneway cemented stopping-filling mining. By applying elastic mechanics theory of the filling mass, with the present production situation on site, the upwards laneway on the first layer of filling body resonably under the condition of safe was designed. The design has resolved the problems that puzzled the mine. in sill pillared stopping under the filling mass.

关 键 词:胶结充填 底柱充填体 工艺研究 

分 类 号:TD853.343[矿业工程—金属矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象