考虑开采扰动对传统矿压理论的修正  

The Modification of Traditional Mine Pressure Theory Conducted by Mining Disturbance

在线阅读下载全文

作  者:张婧[1] 王东 刘长武[3] 

机构地区:[1]西华大学能源与环境学院,四川成都610039 [2]四川省交通运输厅公路规划勘察设计研究院,四川成都610041 [3]四川大学水力学与山区河流开发保护国家重点实验室,四川成都610065

出  处:《铜业工程》2015年第1期36-38,50,共4页Copper Engineering

基  金:国家重点基础研究发展计划(973计划)(2010CB226802);四川大学水力学国重室开放基金(SKHL1312);西华大学重点科研基金项目(z1320404)

摘  要:在深部开采卸荷作用下,采场围岩产生大量裂隙和损伤,直接顶岩层处在峰后阶段,液压支架的重复支撑使其完整性和稳定性都会产生明显降低。文中以埋深800m的邢东矿1126工作面为研究背景,对高水材料长壁充填开采工作面的直接顶岩层垮落步距进行了理论计算,修正了传统矿压理论,计算结果与现场监测实际情况吻合。Due to the unloading in deep mining, fracture and crush is widely existed in wall rock of stope. Since direct roof stratum was already in the post peak status, the repeat prop up would decrease its integrity and stability significantly. Taking the Xingdong 1126 working face in 800 meter deep as research background, this paper amended the mine pressure theory and calculated collapse distance of direct roof stratum in longwall mining filling with high water content. At last, the monitor data was agreed with the calculated results well.

关 键 词:深部开采 峰后 液压支架 重复扰动 矿压理论 

分 类 号:TU452[建筑科学—岩土工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象