检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:石文广[1]
机构地区:[1]中铁十八局集团第六工程有限公司,天津300222
出 处:《铁道标准设计》2015年第5期115-119,共5页Railway Standard Design
摘 要:结合震后四川某地特长高速公路隧道洞口施工的实际工程,针对其提出的免刷坡进洞施工技术,开展震后偏压坡积体免刷坡进洞施工力学效应的分析,通过FLAC 3D有限差分软件计算分析,结果表明:在施工过程要提前作好安全防护准备;左洞洞顶地表呈斜坡状,在剪切应力作用下导致初期支护外侧出现大范围受拉区;该工法可以有效地防止隧道上方坡积土体的滑动,保证施工安全且有效缩短进洞时间,对隧道周围地表植被破坏较小。With reference to the practices in portal construction of a highway tunnel in Sichuan where tunnel portal construction without treatment to biasing slope after earthquake, a mechanics analysis is conducted with finite difference software FLAC 3D of such tunnel portal construction. The results show that protective measures must be taken before the construction and a wide tensile zone is created outside the primary support due to shear stress generated by the tilted surface above the tunnel top and the method can effectively prevent the soil above the tunnel from sliding, which not only ensures safe construction and but also shortens the time to get into the tunnel with less destruction to the vegetation around the tunnel.
关 键 词:公路隧道 震后偏压坡积体 进洞施工 数值分析 力学效应
分 类 号:U452.27[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.63