检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:武会峰
机构地区:[1]冀中能源股份公司东庞矿,河北邢台054201
出 处:《煤炭与化工》2015年第2期89-91,共3页Coal and Chemical Industry
摘 要:东庞矿2612综采工作面安装并使用6.5m综采支架及配套设备,由于向斜构造的存在,工作面在回采后期由俯采逐步转变为大角度仰采,仰采角达15°,结合2612工作面的实际情况,分析煤壁稳定性及其影响因素,提出控制煤壁片帮和端面冒顶的技术措施,保证工作面的安全生产。2612 fully mechanized working face of Dongpang Mine used 6.5 m fully mechanized mining support and corollary equipment, because of the syncline structure, in the late period of working face recovery, mining gradually transformed from underhand stoping into overhead mining, overhead angle with 15° , combined with the actual situation of 2612 working face, the coal wall stability and its influencing factors were analyzed, technical measures of controlling rib spalling and top earing were put forward, which ensured the safe production of the working face.
分 类 号:TD74[矿业工程—矿井通风与安全]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7