诚南煤业15^#煤层综采设备配套方案优化设计  

Optimization Design of Fully Mechanized Coal Mining Equipment for NO.15 Coal Sean in Chengnan Coal Mine

在线阅读下载全文

作  者:刘奇先 赵钰[1] 

机构地区:[1]太原理工大学电气与动力工程学院,太原030024 [2]山西晋煤集团金鼎公司,山西晋城048000

出  处:《煤矿机械》2015年第3期185-188,共4页Coal Mine Machinery

摘  要:根据15#煤层地质条件,以及15#煤层的赋存状况和井田开拓特征,结合矿井设计规模以及晋城地区开采15#煤层的经验,选择合适的采煤机、液压支架、刮板输送机、转载机、破碎机等设备。满足45万t/a的设计生产能力,设计工作面长度为120 m(巷道中心距)。提高设备利用率,实现了安全、高效生产。According to the No.15^# coal seam geological conditions, as well as the occurrence condition and No.15^# coal seam development characteristics, combined with the scale of mine design and experience of mining of No.15^# coal seam in Jincheng area, we have selected the appropriate shearer, hydraulic support, scraper conveyor, conveyor, crusher equipment. Meeting the design production capacity of 450 000 t/a, length of working face is 120 m (tunnel center distance). Improve the utilization rate of equipment, realize safe, efficient production.

关 键 词:综采设备 方案优化 煤层开采 

分 类 号:TD823.97[矿业工程—煤矿开采]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象