检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
机构地区:[1]湖南科技学院土木与环境工程学院,湖南永州425000 [2]中国核工业华兴建设有限公司,江苏南京210019
出 处:《企业技术开发》2015年第3期40-42,共3页Technological Development of Enterprise
摘 要:建设工程招投标制度实施以来,出现了多方面的问题,法制不健全、招标人的违规操作、招标代理机构的水平、投标人围标串标、评标委员会的职业道德及监管方的干预等问题,造成了建设工程招投标市场规范化进程缓慢。文章结合招投标市场实际考察对建设工程招投标目前存在的问题进行探讨,并提出一些对策。There are a variety of problems since the construction project bidding system established,the defect of legal system,the irregularities of the tenderer,The technology level of a procuratorial agency,the collusion of biders,The moral level of the bid assessment professional committee and the intervention from the regulatory department are the resistance of construction project bidding market progress.This paper will show the present problems of the construction project bidding by the investigation of the bidding market and try to put forward countermeasures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117