高水压砂性土层大直径盾构到达施工技术  被引量:1

Construction Technology of Large Diameter Shield Achievement with High Water Pressure and Sandy Soil

在线阅读下载全文

作  者:马军[1] 

机构地区:[1]中铁十四局集团有限公司隧道工程公司,济南250002

出  处:《价值工程》2015年第14期138-139,共2页Value Engineering

摘  要:高水压盾构的到达是隧道修建过程中最关键且最危险的环节,在高水压作用下仅依靠传统的单一的加固技术不能很好的保证该段施工的安全性。为解决这一问题,以南京地铁十号线越江段为例,主要介绍其盾构到达过程中采用的冻结法+水中到达法的施工技术要点及注意事项,为其他高水压盾构接收施工提供技术参考。The achievement of the shield with high water pressure is the most critical and most dangerous link in tunnel construction process.With the high water pressure,the traditional single reinforcement technique can not guarantee the safety of the segment construction well.In order to solve this problem,this paper takes river-crossing section of Nanjing subway line 10 as the example to mainly introduce the construction technology key points and matters needing attention of freezing method + water achievement method in shield achievement process to provide technology references for other shield receiving construction with high water pressure.

关 键 词:高水压隧道 盾构到达 施工技术 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象