高速铁路建设生态环保目标规划与监测方法研究  被引量:4

Study on Object Planning and Supervision Method of Ecological Environmental Protection for High-speed Railway Construction

在线阅读下载全文

作  者:段晓晨[1] 倪艳霞[1] 

机构地区:[1]石家庄铁道大学经济管理学院,河北石家庄050043

出  处:《铁道运输与经济》2015年第4期87-92,共6页Railway Transport and Economy

基  金:教育部人文社会科学研究规划基金项目(11YJAZH121);河北省高层次人才资助项目(2013429102)

摘  要:针对高速铁路建设对生态环境造成的影响,构建高速铁路建设生态环保目标规划与监测指标体系;根据高速铁路建设数据量、监测指标特点及PDCA循环原理,提出适用的监测方法。以某高速铁路项目为例进行分析,当数据量较多、较少和无数据时,可以分别采用BP神经网络、灰色时间序列、德尔菲法进行目标预测。经实际监测结果与预测结果的比较验证,目标规划模型具有一定的合理性,为可持续发展型绿色高速铁路建设提供决策支持。Targeting with the influence of high-speed railway construction on ecological environment, the object planning and supervision index system of ecological environmental protection for high-speed railway construction were established. According to data volume of high-speed railway construction, characteristics of supervision index and the circulation principle of PDCA, this paper puts forward suitable supervision methods. Taking certain high-speed railway construction as an example, the paper makes analysis and puts forward the object forecast could be taken by applying 3 methods (the BP neural network, grey time series and Delphi method) respectively under the conditions of large data volume, less data and no data. Through comparing and validating the actual supervision result with forecast result, the object planning model was proved has rationality and could provide decision-making support for construction of green high-speed railways with sustainable development.

关 键 词:高速铁路建设 生态环保 目标规划 监测方法 

分 类 号:U238[交通运输工程—道路与铁道工程] X820.2[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象