机构地区:[1]山东科技大学矿山灾害预防与控制实验室,山东青岛266590
出 处:《煤矿开采》2015年第2期43-46,共4页Coal Mining Technology
基 金:国家自然科学基金青年科学基金项目(51104093)
摘 要:针对湖西矿深井厚煤层大断面沿空掘巷出现的两帮整体外鼓、底鼓严重等问题,在现场调研、数值模拟的基础上,认为原岩应力高、巷道两帮岩性差、支护结构及参数不合理等是导致巷道变形破坏的主要原因,且小煤柱是整个沿空掘巷保持稳定的关键。据此针对深井厚煤层大断面沿空掘巷围岩结构特点,提出了"高强预应力让压锚杆+补强鸟巢锚索"联合支护方案,经现场监测发现,该支护方案有效地控制了沿空巷道围岩的变形,解决了原支护需多次扩帮、卧底的难题,确保了工作面正常生产。In order to solve the problem of severe floor heave and two-side whole deformation in roadway driven along gob in thick coal- seam in deep mine of Huxi Colliery, applying site survey and numerical simulation, it was believed that high geo-stress, bad lithology and unreasonable supporting structure and parameters were main reasons which resulted into roadway deformation and failure and the small coal-pillar was the key to keeping roadway stability. On the basis of surrounding rock structure characteristic, combined support- ing projection of "high pre-stress yielding anchored bolt + reinforcement bird-nest anchored cable" was put forward. Site observation showed that this supporting projection could effectively control deformation of roadway driven along gob and solved the difficult problem of supporting.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.145