CASS工艺在大型合成氨厂废水处理中的应用研究  被引量:1

Application of CASS Technique in the Research of Wastewater Treatment of Pant of Large Synthetic Ammonia

在线阅读下载全文

作  者:吴蕾[1,2] 常丽新[1] 

机构地区:[1]河北联合大学,河北唐山063000 [2]巴音郭楞职业技术学院,新疆库尔勒841000

出  处:《广州化工》2015年第8期161-163,共3页GuangZhou Chemical Industry

摘  要:采用"气浮池+CASS池+多介质过滤"工艺在处理大型天然气制合成氨企业的生产废水时,在进水0.5 h,曝气6 h,沉淀1 h,排水2 h,闲置0.5 h时,废水中氨氮去除率可达99%,COD去除率可达80%以上,出水指标达到《合成氨工业水污染物排放标准》(GB13458-2001)(大型厂)标准。该工艺运行一年多来,废水处理效果稳定。Aeration flotation tank- cyclic activated sludge system( CASS)- multiple agent filtration process was suit for large- sized natural gas based ammonia synthesis process. Under the operation conditions of CASS,water inlet time 0. 5 h,aeration flotation time 6 h,settling time 1 h,water outlet time 2 h,and vacancy time 0. 5 h,the ammonia-nitrogen removal rates was up to 95% and COD removal rates was up to 80%. The treated wastewater could meet the standard of Discharge standard of water pollutants for ammonia industry( GB / T 13458- 2001) standard. The process was running more than a year. The wastewater treatment effect was stable.

关 键 词:CASS工艺 合成氨废水 废水处理 

分 类 号:X52[环境科学与工程—环境工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象